Meetings
Local Concerns Meeting Pearl St. 5-8-12
Local Concerns Pearl St. Corridor Scoping 5-8-12
Main Street Roadway & Box Culvert Assessment 5-4-12
Amtrak Station Platform and Bus Station Design 4-20-12
UVM Capstone Project Report on Redesign of Amtrak Station-May-2012
FY 11 Audit Supplemental Information
WETNS Draft Phase 1 Report 5-1-2012
The Trustees met with representatives from IBM regarding their Master Plan Design to develop and lease 60 acres of under utilized land, which includes a potential location for the Essex Police Facility, an aesthetic mixture of light manufacturing and professional office buildings. The Trustees deferred the approval of additional information from the FY 11 Audit, approved Lamoureux & Dickinson as Design Engineer for the Lincoln Street Sidewalk & Lighting Project and awarded the Utility Rate Study to Aldrich and Elliott. They approved and signed an amendment to the Ladder Truck MOU with the Town of Essex.
IBM Master Plan Presentation to Trustees 4-24-12
Memo to Trustees Lincoln Street 4-20-12
Memo to Trustees Utility Rate Study 4-18-12
Memo to Trustees Server 4-20-12
Amendment to Ladder Truck MOU 4-16-12
You may watch the program on-line by clicking here:http://www.cctv.org/watch-tv/programs/essex-junction-trustees-70
The Village Trustees had a regularly scheduled meeting on March 27th, at 6:30 PM. Some of the topics discussed include:
-A presentation on the status of the fire department's bid process for a new ladder truck.
-The approval of the employee association contract.
-Further discussion of the 25 South Street/Stevens Park boundary line.
-The denial of a request to waive sewer/water connection fees on a new construction project.
http://www.cctv.org/watch-tv/programs/essex-junction-trustees-69
Ladder Truck Replacement Update 3-23-12
The Trustees approved the submission of a loan application for the Wastewater Treatment Facility Rehab Project, the construction engineering agreement and authorized bidding of the project. They discussed architectural designs for the Amtrak station, continued discussion of a boundary issue on South St. next to Stevens Park, and voted to change the fee schedule to waive the permit fees for EJRP.
Memo Stevens Park Boundary 3-9-12
You may watch the meeting on-line by clicking here:http://www.cctv.org/watch-tv/programs/essex-junction-trustees-68